Press Enter to jump to main content

Press Releases

01 Jul 2025

Traffic Upgrades to Improve Connectivity Between Sheikh Zayed Road and Al Khail Road


an image of RTA traffic upgrades

Dubai’s Roads and Transport Authority (RTA) has completed a series of rapid traffic improvement measures to enhance connectivity between Sheikh Zayed Road and Al Khail Road via Al Meydan Street. The works included widening the exit from Sheikh Zayed Road to Al Meydan Street from one lane to two and increasing the capacity of the bridge over First Al Khail Road from three to four lanes to accommodate vehicles travelling between Al Khail Road, Al Meydan Street, Sheikh Zayed Road and Al Hadiqa Street in both directions.


Additionally, RTA expanded the connecting ramps between the surface road and the bridge over First Al Khail Road from one lane to two, improving access for vehicles heading towards Al Khail Road and Al Meydan Street.


These enhancements reflect RTA’s continued efforts to realise the vision of the wise leadership by proactively responding to the emirate’s rapid urban and population growth. Through ongoing infrastructure development and road network optimisation, RTA aims to meet evolving mobility needs and support future expansion.


This achievement is part of RTA’s master plan to deliver more than 75 traffic improvement projects across key areas of Dubai in 2025. It aligns with RTA’s strategy for sustainable development aimed at improving quality of life, enhancing community well-being, and further cementing Dubai’s position as a global leader in integrated infrastructure and seamless, sustainable mobility.


The project also included widening the Exit No. (D69) from one lane to two for vehicles travelling from Sheikh Zayed Road towards Al Khail Road and Al Meydan Street. This expansion effectively doubled the exit’s capacity from 1,500 to 3,000 vehicles per hour. As a result, travel times during peak morning and evening periods were reduced by up to 40%, while vehicle queue lengths decreased by as much as 50%.


As part of broader efforts to enhance traffic flow and improve the efficiency of Dubai’s Road network, RTA also increased the capacity of the bridge over First Al Khail Street from three to four lanes in both directions. The upgrade benefits vehicles travelling between Al Khail Road, Sheikh Zayed Road, and Al Hadiqa Street.


This enhancement raised the bridge’s capacity by over 33%, from 4,500 to 6,000 vehicles per hour, and reduced peak-hour crossing times from seven minutes to four, an improvement of approximately 40%.


Furthermore, RTA widened the connecting ramps between the surface road and the bridge over First Al Khail Road from one lane to two, which improved traffic flow by reducing congestion and waiting times by more than 50%, particularly during midday and evening peak hours. The enhancement played a key role in facilitating smoother vehicle movement between Sheikh Zayed Road and Al Khail Road in both directions.

Engage with Us

We are here for you. Do not hesitate to communicate with us via the following channels:

Listening ...

You are being redirected to an external website

Please wait a moment ...

Content loading ...

Please wait for a moment