Widening the Bridge Leading to Terminal 1 of Dubai International Airport
Project Description
- Widening the existing bridge from three to four lanes
- Constructing a new bridge using an innovative system of steel box girders integrated with a composite concrete slab.
- The total length of the bridge, including its ramps, is 171 metres, with the main span extending nearly 70 metres.
Project Benefits
- Increases the bridge’s capacity from 4,200 to 5,600 vehicles per hour, a 33% increase.
- It is part of RTA’s continuous efforts to improve traffic flow and strengthen connectivity between major corridors and vital facilities, most notably Dubai International Airport.
Leave a comment