Widening Entrances to Mall of the Emirates

Project Status:

27.0%
>

Project Location:

Mall of The Emirates - مول الامارات

Project Description

  • Widening and improving the entrances to Mall of the Emirates and the surrounding streets and intersections as well as pedestrian and cycling lanes.
  • The construction of a 300-metre bridge on Sheikh Zayed Road with a single lane
  • Improving the surface roads extending 2.5 km around the mall
  • Developing three signalised surface intersections and modifying the bus station at the Mall of the Emirates Metro Station
  • Converting the street next to Kempinski Hotel from one-way to two-way and enhancing pedestrian and cycling lanes.
  • Works also include paving, lighting, traffic signals, rainwater drainage system, and landscaping
  • The project cost is AED 165 million.


Project Benefits

  • Reduces the travel time for traffic coming from Abu Dhabi and Jebel Ali to the Mall of the Emirates, cutting it from 10 minutes to just one minute.
  • Reduces the travel time for motorists coming from Umm Suqeim from 15 minutes to 8 minutes
  • Enhances traffic efficiency and safety on the roads surrounding the Mall

Leave a comment

Your Name
Email address
Comments

Submit

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.