Project Details

Roads & Transport Authority - Project Details



Accessibility

Use the toggle below to switch the contrast

Contrast switch:

Increase or decrease the size of the text to make it more suitable for your reading comfort.

Text resize

Default Setting

Use the text-to-speech button to convert the written text into audio for your convenience.

Read Speaker:

Learn more about our accessibility features

Learn more
عربي

Project Details

Launching the construction of Shindagha Bridge project

 

Shindagha Bridge Project features an iconic design based on the concept of the infinity sign. It is part of the AED 5.035 billion Shindagha Corridor Project extending 13 km along Sheikh Rashid Street as well as Al Mina, Al Khaleej and Cairo Streets.

The bridge is being developed under the third phase of the Shindagha Corridor Project, following the completion of the first two phases. The bridge extends about 295 m, 150 m of which is over the Dubai Creek, and consists of six lanes in each direction in addition to a pedestrian crossing. The Bridge rises 15.5 m above the water level, which allows the passage of various types of boats plying the Creek. The bridge’s iconic design features an architectural arch shaped in the form of the mathematical symbol for infinity. The top of the infinity arch rises 42 m. About 2,400 tons of steel will be used in the construction of the bridge. 

 

an image about Launching the construction of Shindagha Bridge project

Project Cost: AED 5.035 billion

Locatio Map:

Project Location

Project Images

Project Videos

Contact Us

If you have any questions, don’t hesitate to ask us

Contact Information

Contact RTA

800 90 90

Overseas callers 24/7: +971 4 605 1414

Tel: +971 4 284 4444

Fax +971 4 206 5555

Email RTA

E-mail: ASK@rta.ae


Roads & Transport Authority

P. O. Box: 118899

Dubai, United Arab Emirates.



Submit a question

How would you prefer us to contact you?

${loading}

You are being redirected to an external website

Please wait a moment

Redirecting