Project Details
Al Khawaneej Corridor
Project Description
- The development of three main intersections on Al Khawaneej and Al Amardi streets.
- The construction of service roads with a length of 23 kilometres on Al Khawaneej and Al Amardi streets.
- The completion of a tunnel on Al Khawaneej Street, consisting of three lanes in each direction.
- The implementation of a surface intersection controlled by traffic lights, ensuring free and safe transportation of traffic on Al Khawaneej Street.
- The development of a roundabout at the intersection of Al Khawaneej Street and Al Amardi Street.
- The development of an intersection between Al Omari Street and Emirates Street via the construction of a flyover across Emirates Road towards Al Awir area, with a capacity of two lanes in each direction.
- The construction of a pedestrian crossing bridge near the Arabian Center on Al Khawaneej Street.
Project Benefits
- Reduced the journey time from Emirates Road to Sheikh Mohammed Bin Zayed Road from 25 minutes to 9 minutes.
- Reinforcement of the airport road axis and linking Al Awir and Al Khawaneej areas.
- Increased the capacity of Al Khawaneej Interchange from 8,000 vehicles per hour to 16,000 vehicles.
- Reduced the waiting time at the intersection of Al Khawaneej and Sheikh Zayed bin Hamdan Al Nahyan Streets from 330 seconds to 45 seconds.
- Reduced The waiting time at the intersection of Al Khawaneej and Al Amardi Streets has been reduced from 120 seconds to 60 seconds.
Project Location
Project Videos
Contact Us
If you have any questions, don’t hesitate to ask us
Contact Information
Call Centre agents 24/7: 800 90 90
Overseas callers 24/7: +971 4 605 1414
Tel: +971 4 284 4444
Monday to Thursday 07:30 AM to 03:30 PM
Friday 08:00 AM to 12:30 PM
Fax +971 4 206 5555