Developing the Entry and Exit Points of the Key Five Areas for "Dubai Holding”

Project Location:

Different areas in Dubai - مناطق مختلفة في دبي

First Project “Jumeirah Village Circle and Triangle”

Project Description

  • Construction of four additional entrances and exits to the area by developing grade-separated intersections from main roads, which adds a total of 10 extra lanes.
  • Installation of 15 traffic signals and the implementation of safety features at intersections.

Project Benefits

  • Accommodating up to 20,000 vehicles.
  • Regulating traffic flow and enhancing safety.
  • Reduce travel time on internal roads and access points by 70%

 

Second Project “Dubai Production City”

Project Description

  • Constructing additional bridges for entry and exit points from Sheikh Mohammed bin Zayed Road.

Project Benefits

  • Reducing travel time on entry and exit points, as well as improving traffic flow on internal roads by 50%.

 

Third Project “Business Bay”

Project Description

  • Implementing surface improvements at intersections near the Business Bay from Sheikh Zayed Road.
  • Constructing a pedestrian bridge.
  • Enhancing surface conditions on internal roads in the Towers area.

Project Benefits

  • Separating pedestrian movement from vehicle traffic at the intersection of Business Bay and First Al Khail Road.
  • Reduce travel time by 30% across entry and exit points and internal routes.

 

Fourth Project “International City - Phase 3”

Project Description

  • Expanding the main entrance from Al Manama Street by adding an extra lane and widening internal roads.
  • Upgrading the intersections to be controlled by traffic signals.
  • Introducing a new connection linking International City to Nad Hessa Street, facing Dubai Silicon Oasis.

Project Benefits

  • Regulating traffic flow and ensuring safety in the area.
  • Reducing travel time to 5 minutes.

 

Fifth Project “Palm Jumeirah”

Project Description

  • Constructing two pedestrian bridges to replace at-grade crossings
  • Adding additional acceleration and deceleration lanes, spanning 6 locations.

Project Benefits

  • Improving access to the parallel service roads.
  • Reducing travel time for entry, exit, and internal movement within the area by 40%.