Internal roads in 3 districts

Project description
- The construction of internal road in three residential districts namely; Al Qusais 3, Al Qouz 2 and Al Qouz 3
- The Internal Roads at Al Qusais 3: span an area of 225 hectares. It includes the pavement of roads stretching 6 km, roadside parking slots, vehicle parks for the existing mosques, and street lighting network
- The internal roads at Al Qouz 3: Comprises the pavement of 8 km-long roads covering collector roads of 7 metres in width, local roads of 6.5 metres in width, roadside parking slots measuring 2.5 metres in width, and lighting works.
- The internal roads at Al Qouz 2: It comprises the construction of roads extending 11 km including single carriageways and dual carriageways, roadside parking slots, and a storm-water drainage network
Project benefits
- Improves the infrastructure
- Serves the residential communities
Leave a comment