Dubai Parks Bridges

Project Description
- The construction of a 3-lane bridge and a 2-lane bridge:
- The 3-lane bridge, stretching 1500 metres, acts as a main entry on the Sheikh Zayed Road for vehicles coming from Dubai and heading to Dubai Parks
- The 2-lane bridge, stretching 1000 metres, acts as a main exit on the Sheikh Zayed Road from Dubai Parks in the direction of Abu Dhabi.
- The development of roads extension of 16 km, comprising a dual carriageway of 2 lanes in each direction
- It includes lighting, traffic signs, rainwater drainage, utility lines, besides shifting and protecting utility lines intercepting the project works such as electricity, water, communication and others
Project Benefits
- Links the Dubai Parks project with the Sheikh Zayed Road
Leave a comment