Widening Al Garhoud Bridge

Project Description
- Widening Al Garhoud Bridge by replacing the existing bridge with a new one
- Constructing two bridges; each of them has 7 lanes at each direction
- The total length of the bridge is 520 metres with structures rising 16 metres above the water level
Project Benefits
- Ensures free navigation in the Creek
- Provides additional traffic capacity as it will be capable of handling 16000 vehicles per hour
Leave a comment