Project Details

Roads & Transport Authority - Project Details



Accessibility

Use the toggle below to switch the contrast

Contrast switch:

Increase or decrease the size of the text to make it more suitable for your reading comfort.

Text resize

Default Setting

Use the text-to-speech button to convert the written text into audio for your convenience.

Read Speaker:

Learn more about our accessibility features

Learn more
عربي

Project Details

A new Bridge at Al Qudra - Lehbab Road

The project embraces opening  a new bridge at the intersection of Al Qudra Road with Lehbab Road comprising 3 lanes in each direction with the aim of easing the traffic flow from the Emirates Road to Seih Assalam. The opening of the bridge comes shortly after the opening of Al Qudra Road.
 

The importance of this bridge stems from the vitality of Al Qudra Road. This road has become a key traffic corridor for the traffic movement inbound from Jumeirah via Umm Suqeim, then passing through the flyover of Al Khail Road to link with the Arabian Ranches Interchange on the Sheikh Mohammed bin Zayed Road.

 

The design of the bridge focused on ensuring highest safety levels for all road users following the observation that some motorists exceed the specified speed limits, especially in the sector from Jebel Ali Lehbab junction up to Bab Al Shams R/A. Accordingly. A special lane on this bridge has been dedicated for cyclists crossing

A new Bridge at Al Qudra - Lehbab Road

Project Location

Project Images

Project Videos

Contact Us

If you have any questions, don’t hesitate to ask us

Contact Information

Contact RTA

800 90 90

Overseas callers 24/7: +971 4 605 1414

Tel: +971 4 284 4444

Fax +971 4 206 5555

Email RTA

E-mail: ASK@rta.ae


Roads & Transport Authority

P. O. Box: 118899

Dubai, United Arab Emirates.



Submit a question

How would you prefer us to contact you?

${loading}

You are being redirected to an external website

Please wait a moment

Redirecting