Trade Centre Round About Development

Project Status:
Project Location:
Project Description
- Constructing 5 bridges spanning 5,000 metres in total and converting the existing roundabout into a surface intersection
- It is part of a broader development plan that includes Al Mustaqbal Street Development Project
Project Benefits
- Enhances the traffic flow coming from Sheikh Zayed Road towards 2nd December Street, as well as the traffic coming from Al Mustaqbal Street towards Sheikh Zayed Road southbound.
- Ensures free-flowing traffic from 2nd December Street (Jumeirah and Al Satwa) to Al Majles Street leading to Al Mustaqbal Street (serving DWTC and DIFC), and from Sheikh Rashid Street to Deira.
- Ensures a smooth traffic flow on the upper-level bridge from Sheikh Zayed Road to Sheikh Khalifa bin Zayed Street.
- Cuts the delay time from 12 minutes to 90 seconds and shorten the travel time from Sheikh Zayed Road to Sheikh Khalifa bin Zayed Street from 6 minutes to just one minute.
Leave a comment