The Development of Al Wasl Road
Project Description
- The development spans 15 km, from the intersection with Umm Suqeim Street to the junction with 2nd December Street.
- It includes the upgrade of six intersections, comprising enhancements to one junction and the construction of five tunnels totalling 3,850 metres.
- It includes widening the street from two to three lanes in each direction.
Project Benefits
- Reduces travel times along Al Wasl Road by 50% .
- Increases the capacity from 8,000 to 12,000 vehicles per hour in both directions.
- Keeps pace with the needs of urban development and population growth, enhances the traffic flow, and contributes to the quality of life for residents and visitors of Dubai.
Leave a comment