Press Enter to jump to main content

Algeria Street Improvement

Project description 

  • The development stretches 2 km from the intersection of Algeria Street and Al Khawaneej Street (South) to the intersection of Tunis Street (North) at Al Muhaisnah (1) and Al Mizhar (1)
  • Widening Algeria Street from the intersection of Street 11 near Al Khawaneej Street up to the intersection with Tunis Street as well as Streets 27 and 31
  • Increasing the number of lanes of Algeria Street from two to three lanes in each direction
  • Transforming the existing roundabout into a signalised junction to provide left turns
  • Introducing cycling tracks and designated pedestrian zones stretching from Street 11 to Street 27 on Algeria Street's left side, and from Street 27 to Tunis Street on the right side
  • Paving of a service road along both sides of Algeria Street to link with the service roads for Streets 27 and 31
  • Providing parallel parking spaces for villas on both sides along with angle parking in areas adjacent to the junction of Algeria Street with Streets 27 and 31

 

Project Benefits

  • Increases the road's capacity from 6,000 vehicles to 9,000 vehicles per hour in both directions
  • Serves the residential communities of Muhaisnah and Al Mizhar
  • Improves road quality and reduces the travel times from Al Khawaneej Street to Tunis Street from 15 minutes to just 7 minutes during peak hours, marking a reduction of over 50%

Leave a comment

Your Name
Email address
Comments

Submit

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Engage with Us

We are here for you. Do not hesitate to communicate with us via the following channels:

Listening ...

You are being redirected to an external website

Please wait a moment ...

Content loading ...

Please wait for a moment